GLUING AND SOLES ATTACHING
- Should be care of its accuracy scribing board.Using pressure is
about 2-3kg/cm.
- Should be removed its surface of leather based on the scribed
circular measure in grinding process.
- Should be pasted by priming liquid of the attaching part of
outsole.
- Its heating temperature should be 100℃ ± 5℃
- The operators should be careful of putting cement on both upper
and sole in balance and properly, Do not make dirty on upper and soles.
- When lamination sole on the upper, the operator must control the
sole is fittingly attached to the upper can't make any crooked, and try to press the edge
as tight ass possible.
- When pressing the shoes, the operator should properly control the
20-40 kg.cm and (5-8 sec.) of the press machine.
- After pressing the soles.
For the
vulcanizing shoe: collect the shoes to the steam boiler for rubber vulcanizing.
For cool-cementing shoes: collect shoes to the cooling equipment.
- The operator can not take off the lasts from the shoes before the
shoes get cooling stabilized.
|