STITCHING ROOM
1.The process of the stitching line well be designed according. to the shoe upper
pattern design. It necessary to have 80~95 of both machine and hand job operators for one
line to catch 1,500~2,000 pairs daily (per 8 hours)productivity.
2.Stitching operators should be careful of the needles and the width of edge to match
the buyer’s request.